久久久91精品国产一区二区三区|亚洲中文无码卡通动漫|国产AV国片精品无套内谢无码|国产99久久久国产精品电影|

The Annual Equipment of Pipeline and Oil &Gas Storage and Transportation Event
logo

The 26thBeijing International Exhibition on Equipment of Pipeline and Oil & Gas Storage and Transportation

ufi

BEIJING, China

March 26-28,2026

LOCATION :Home> News> Industry News

Kazakhstan plans to launch Line C of gas pipeline to China in Oct

Pubdate:2014-02-27 10:44 Source:fengyang Click:

Astana plans to launch the so-called C line of the Kazakhstan-China pipeline with an initial capacity of up to 5 billion cubic meters/year in October, Sauat Mynbayev, chairman of Kazakhstan's national oil and gas producer KazMunaiGaz, said late Tuesday.

"In October 2014, we plan to launch the C line of the Kazakhstan-China trunk gas pipeline with an [initial] capacity of up to 5 Bcm/year," he said as quoted on the website of the country's Prime Minister.

China's CNPC had previously said it expected construction of the line to be completed by the end of 2013.

The line's capacity is set to reach the planned 25 Bcm/year by the fourth quarter of 2014, with 5 Bcm/year of the capacity belonging to the Kazakh side, Mynbayev said, reiterating earlier statements by Kazakh officials.

The Kazakhstan-China route is part of the Central Asia-China gas pipeline network, which starts in Turkmenistan and cuts through Uzbekistan and Kazakhstan before ending in China's western Xinjiang province.

The C line will run parallel to the existing A and B lines of the Central Asia-China route, which are already in operation and have a total capacity of 30 Bcm/year.

Kazakhstan also plans to launch the Beyneu-Bozoy section of the domestic gas network sometime this year, Mynbayev said, earlier than the previously expected 2015 launch.

Beyneu-Bozoy, which is part of stage two of the Kazakhstan-China gas project, will continue the 6 Bcm/year Bozoy-Shymkent line launched last September. Construction of an additional pumping station is expected to bring total capacity on the Beyneu-Bozoy-Shymkent route to 10 Bcm/year.

The Bozoy-Shymkent line links up to the Central Asia-China gas route in Kazakhstan's south.

The capacity of the Beyneu-Bozoy-Shymkent route could be increased to 15 Bcm/year, according to national gas pipeline operator KazTransGaz.

双峰县| 花垣县| 高州市| 苏尼特左旗| 彭水| 松原市| 浪卡子县| 武胜县| 英超| 丽江市| 嘉禾县| 黑水县| 黑龙江省| 阿合奇县| 仁布县| 双牌县| 黔西县| 临洮县| 胶州市| 京山县| 合阳县| 和林格尔县| 平谷区| 葵青区| 城口县| 察隅县| 嘉鱼县| 翁牛特旗| 阿拉善盟| 东港市| 通化县| 珲春市| 奎屯市| 漾濞| 开平市| 闽清县| 新乐市| 巴林右旗| 无棣县| 静海县| 德化县|